R³
Instrument, Performance, and Installation
Scroll Down
Scroll Down
Scroll Down
Scroll Down
Scroll Down
Scroll Down
Scroll Down
2021
Performance
Instrument
Quadraphonic
Installation
R³ was a process-based project in which an instrument was built in a 20m high silos, where sounds from a disused industrial facility were constructed into a digital instrument and amplified through a silo on the same site as a resonant chamber. The performance was subsequently recorded and developed into a quadraphonic installation.
